55 Leroy Street

Works are commencing well onsite, we are currently working on the internal upgrade works within the 1st floor office space, along with installing the new Ryno decking system to form a new roof terrace area in accordance with the architect design and drawings provided. We are coordinating the works on a floor-by-floor basis to allow…

139-142 North Street, Brighton

External works have commenced to the South and West elevation of 139-142 North Street, Brighton. The external repairs and maintenance works will include the following: Box gutter lining Brickwork repairs and repointing Stonework repairs and cleaning Repair and replacement of windows Complete external redecoration works The project has required strategic planning given the heightened security…

Chiltern Court

Scaffolding has now been fully dismantled at Chiltern court, with the low-level repairs scheduled to take place in the upcoming weeks. This has been a fantastic project to be involved in, working with a great Client and Contract Administrator, we are delighted with the outcome and are proud to add this to our strong portfolio…

Kings Gardens

Phase 2 of the external refurbishment and redecoration works to this period architectural style property located in West Hampstead are progressing well. The existing asphalt from the dome is currently being refurbished. This phase has been challenging as the structure of the dome is open into a resident’s flat. A temporary ceiling has been installed…

1 – 32 Granfield Street

The external refurbishment project has just commenced to this private development just off Battersea Square. Works to the large residential block will include – Masonry works Roof repairs, stripping up of small roof with new Bauder felt system, slate repairs, and lead repairs Communal walkways, full replace walkway surface with Triflex Pro Terra waterproof system…

Manor House

We have just commenced the external redecorations and refurbishment project to this commercial unit located in Leatherhead. Our works here will include – Partial roof repairs and replacements Masonry and brickwork repairs DOFF cleaning Complete external repairs and decorations   Look out for project updates as works progress on site.

34 Sloane Court West  

Rear elevation refurbishment works are now in progress to this residential property located in the Royal Borough of Kensington and Chelsea. Our works here will include the following: Scaffolding Doff clean Timber repairs Masonry restoration Pitched & flat roofing works Pipe lagging Upgrading the current lightning protection system Complete external decorations Look out for further…

New Cross Fire Station

At New Cross Fire Station, the scaffolding is being erected and progressing well. In the meantime, our sample DOFF clean was approved and will commence following hand over of scaffolding. We can’t wait to restore this building back to its former glory and look forward to sharing further updates as works unfold.

Gwydyr Mansions

The external project to the basement, roof area and steps to underground apartment have just commenced. Works to this mansion block of apartments in the centre of Hove will include; Waterproofing works to basement property Take up existing paving slabs / asphalt Applying Wecryl guaranteed liquid system Reinstate new substrate and existing paving slabs Installation of walkway…