Our works are progressing well to the roof area at Senator House; we are carrying out the investigation of various roof leaks and the associated application of an insurances backed liquid applied waterproofing system to several roof areas. Works also include: Removal of existing timber planters to flat roof terrace area Removal of existing decking…
Collins are currently carrying out the external restoration of the front elevation at No 14 Cranley Gardens. Our works include the following: Full access scaffolding to front elevation, and high level access to rear Doff cleaning Roofing works including replacement of missing slates, lead repairs & replacing the access roof hatch Renewing asphalt covering and…
The external repairs and redecorations project is now to complete to this mixed use Residential and Commercial property located nearby to Euston Station. Works to this project included: Timber window repairs Roofing works Masonry restorations Asphalt roofing repairs & solar reflective painting works Abseiling works Complete external redecorations Please contact us for a detailed case…
We are delighted that the scaffold dismantling has begun to the front elevation of this row of seven terraced properties. Working closely with the project team we have undertaken extensive works including, main roof repairs, liquid applications to box gutters and flat roofs, timber repairs and bespoke joinery, comprehensive masonry restoration, and full redecoration of…
Refurbishment works to all six of the landlord stair cores have commenced at 99 Kensington High Street. This Grade II Listed mixed-use building was constructed in circa 1930s and provides both office and retail accommodation. Our works will include the full strip out and reinstatement of electrical services, repairs to the building fabric and complete…
As part of the on-going works to the lift shaft extension and common parts upgrade, we have recently taken receipt and installed the fully restored Front Entrance Doors. The doors were removed, stripped of all ironmongery and sent away to our joiners to be refurbished. All layers of varnish and lacquers were removed to identify…
Our external repair works are progressing well at New Cross Fire Station; The windows are currently being overhauled internally in readiness for redecoration. Scaffolding has been extended to the spire, allowing us to carry out cleaning, repairs and restoration works that will provide a lasting finishing touch to the project. Look out for further progress…
We have successfully completed the restoration of this property’s main façade. Through comprehensive DOFF Cleaning and extensive Masonry and Timber Repairs, the building has been carefully brought back to its former glory. A full list of our works included: Doff cleaning Substantial repairs to the main entrance surround of No 23-24 Masonry works, brick repairs/pointing…
The erection of scaffolding is now almost complete at 12 Langley Court. A collaborative effort involving careful planning between multiple parties was required, due to the location’s logistical restraints in one of London’s busiest tourist areas, which attracts over 44 million visitors annually. The scaffold erection and all external works are being carried out whilst…
Works are nearing completion at Russell Court; we have handed over levels 9-2, we are snagging on levels 1-2 and are currently picking up the finishing items including installation of the bespoke carpet to ground floor entrances and corridors. The new suspended ceilings with drop down borders have been installed to entrances, the last of the…