53 Warminster Road
Internal & External Completed Structural Repair Works.
Project Description:
- Full Scaffold with temporary roof
- Underpinning works to right hand elevation and rear elevation in accordance with engineers requirements
- Helifix repairs and tie supports strapping of front and rear elevation walls
- Removal of existing concrete roof tiles and replacement with new slate tiles
- Internal structural timber and steel works , steels treated with Intumescent coating to achieve 60 minute fire rating.
- Removal and replacement of right hand gable wall
- Masonry repairs to brickwork and stone window cills and surrounds
- Upgrading of loft insulation to meet regs
- Installation of 2 layers of 12.5mm Fireline boards to ceilings on top floor
- General redecorations and associated repairs
For a more detailed case study, please contact us.