We have recently completed the dilapidation works to this commercial unit located in Hailey Road, Erith.
The previous tenant had left this unit in a state of disrepair, so we were invited to bring this unit back to a lettable condition.
Our works included the following;
- Strip out of all tenant belongings, partitions, services, fixtures & fittings
- Asbestos removal
- Carry out extensive roof repairs
- Introducing flame retardant treatment to soffit
- Install new shop frontage & electronic roller shutter
- Isolated masonry repairs to external areas
- Underground CCTV survey & associated minor repairs
- Reconfigure WC block to form; Gents, Ladies & Disabled toilet facilities & associated works
- Full electrical upgrades, including; New distribution board, design and install new lighting system, new fire alarm installation & associated power upgrades
- Extensive preparation & floor coating
- Supplying of new tea station
- Full redecoration throughout
For a full case study, please contact us.