99 Kensington High Street

https://www.collins-contractors.co.uk/wp-content/uploads/2026/01/99-Kensington-High-Street-Tiles.mp4 As part of our works on site at 99 Kensington High Street, our specialist Contractors are completing repairs that carefully preserve the character of some tiled areas. The invisible repair method is being used to restore the appearance of the tiles whilst ensuring long-term durability. We are pleased with how this is developing so…

2 St James

We have been engaged by The Crown Estate to solve the problem with the existing curved glass doors. Whilst aesthetically they are very pleasing, they are heavy to operate. Following local authority planning consultation the solution was agreed to install an aluminum powder coated framed, leaf and half set with automatic operation. Works are being…

DOFF Training

Collins held a DOFF training course at head office, offering our team knowledge in industry leading cleaning technology by their experienced professional operatives. From high-pressure water and eco-friendly blasting systems to spray and brush painting systems, DOFF are able to provide solutions for all requirements. Our team look forward to putting their training in to…

Gwydyr Mansions

We’re pleased to share the successful completion of works at Gwydyr Mansions, Brighton. Originally appointed to undertake roofing works in collaboration with the client team and local council, the project quickly evolved as site investigations progressed. Upon securing the site boundary and lifting the paving slabs, we uncovered a failed and incompatible liquid roofing system.…

36 Great Queen Street

Our works are progressing well to this commercial period property, located in the heart of London’s Covent Garden. Externally, the scaffold is now fully erected and the Doff cleaning has commenced. Internally, we have completed the strip out and the electrical upgrades are now underway. Look out for further updates coming soon.

Holloway Fire Station

The scaffold is now complete at Holloway Fire Station and works are underway. Our team worked with the LFB to minimise disruption and enable the station to function as normal, whilst ensuring the structure was erected safely and to the highest possible standards. The validations of the existing plant at roof level are underway and we…

65 Holland Park

Our works are progressing well to this Grade II Listed residential block located in London’s affluent, Holland Park. Externally, our works are nearing completion with final coats of paint being applied. We have carried out extensive masonry and brick repairs, overhauled and repaired windows and joinery, and introduced new lead coverings to windows heads, cornices…

37-45 High Street Kensington

It’s great to be back at 37–45 High Street Kensington almost 12 months on, carrying out the end-of-defects inspections and remedial works. Walking through the building today, the reception space is still looking as impressive as it did on handover — a testament to the quality of the design, the materials, and the workmanship that went into…

10k Charity Fun Run

Well done to everyone who took part in the Bromley 10K Charity Fun Run on Sunday. We braved the cold and ran in aid of our chosen charity of the year > Mates In Mind Thank you to all the supporters who came along to cheer us on and thank you for the generous donations…

2-8 Hyde Park Gardens

Works are nearing completion at 2-8 Hyde Park Gardens; scaffold is currently being dismantled to the garden facing elevations overlooking Hyde Park down to balcony level. We have recently completed the partial rebuilding of the roof level stack with the neighbouring property as per the structural engineer’s requirements and introduced a waterproofing covering to 21no…