Works are progressing well at 190–192 Sloane Street, with roof repair works and the fire escape restoration nearing completion. Works have also commenced on the final façade along Sloane Street. As this elevation is positioned directly above the entrance to Louis Vuitton, we are working closely with the on-site team to carry out these works…
Collins have been instructed to undertake essential remedial works to the rear elevation of Spring Gardens Court, which is located within a conservation area just off Vauxhall Walk, towards Albert Embankment. The scope of works includes the installation of scaffold access to the rear elevation balconies. This will enable the redesign and installation of an…
Working alongside the client’s appointed engineer, we investigated a series of concerning cracks by exposing the affected area for a full inspection. As a result, it was agreed that Helibar fixings would be installed at regular intervals from floor to ceiling to reinforce and stabilise the corner. Following completion of these works, the area has…
Works are now complete at New Cross Fire Station. With the scaffolding fully struck, the remarkable transformation is now on display. This extensive refurbishment and redecoration project has carefully restored one of Europe’s oldest operational fire stations, preserving its historic character while enhancing its appearance for years to come. Works to this Grade II Listed…
Following our recent post, scaffolding is progressing rapidly on Phase 2 at Bickenhall Mansions and with such a clear blue sky, it was too good an opportunity to miss a progress photo. We look forward to providing more updates from site shortly, once the scaffold is handed over and clad with our traditional Collins blue…
We’re pleased to share that the scaffold has now been dismantled at 36 Great Queen Street, marking a significant milestone in the project and showcasing the excellent progress made by the team on site. Externally, the works have included: Masonry repairs, including the rebuilding of a failed stack • Extensive timber window repairs • Full…
Works are nearing completion on two industrial units at Orpington Business Park. Externally, the project is almost wrapped up, with roof repairs and liquid works now complete, and scaffold handover imminent. The only remaining item is the replacement of the lower-level damaged metal sheet panels once the scaffold is removed, and any low-level redecorating. Inside,…
Our project at 65 Holland Park has now reached completion; we are delighted with the results to this Grade II listed Residential block. Works to this project included the following – Externally: Full access scaffolding to all elevations Extensive masonry repairs including, rendering, repointing, helifix repairs, brick replacements etc Overhauling windows including repair care &…
Scaffolding is progressing well to the front elevations of ‘The Circle’. Works to the rear elevations are underway, including roof works, masonry repairs to the rear façades, and timber and metal repairs to cantilevered balconies. We are delighted to be working on such an iconic building and look forward to sharing further updates as the…
Our refurbishment project is moving forward, with both internal and external upgrades progressing well Internally, First fix mechanical and electrical works, along with carpentry and plastering are all proceeding in line with the programme. Externally, brick and masonry repairs have now been completed. Window repairs are also finished, and first coats of paint are currently…