Russell Court

Works are nearing completion at Russell Court; we have handed over levels 9-2, we are snagging on levels 1-2 and are currently picking up the finishing items including installation of the bespoke carpet to ground floor entrances and corridors. The new suspended ceilings with drop down borders have been installed to entrances, the last of the…

Manor House

We have just completed the external redecorations and refurbishment project to this commercial unit located in Leatherhead. Our works to this project included – Partial roof repairs and replacements Masonry and brickwork repairs Timber restorations DOFF cleaning Complete external repairs and decorations   For a detailed case study, please contact us.

Erith Fire Station

Works have now concluded at Erith Fire Station which involved remodelling of the Breathing Apparatus Training Centre. This now provides a customisable floor plan simulation style training facility, equipped with heat pumps, AHU’s and 50-degree heat smoke machines that replicate a real fire scenario. The project required extensive M&E design coordination and development to bring…

12 Langley Court

The complete external refurbishment to this mixed used property located in Covent Garden has commenced this morning. Our works to this project will include: New window installation Replacement waterproof liquid to box gutters (Sika Decothane Ultra) Brickwork repointing and masonry repairs DOFF cleaning New AOV and skylight installations Complete external redecorations to all elevations  …

Albemarle

Scaffolding is now fully erected and netted at this high-end residential building in Wimbledon, marking the start of our comprehensive refurbishment project. Our external works will include: Masonry restorations Balcony repairs Timber and Crittall Window repairs Fascia and Gutter replacements Roofing repairs including overlaying liquid roofs Complete external redecorations to all previously painted surfaces. Internally,…

317 Malborough House

We have just commenced a Fire Safety project to this fully occupied residential block in Kennington. Our works here will include: Electrical testing Emergency lighting works Fire alarm replacement in communal areas and within individual flats Remedial works to communal fire doors   We look forward to sharing updates of these essential improvements, as our…

69 Holland Park

The internal structural repair and lime plaster reinstatement works within one of the flats in this Grade II Listed Residential block has commenced today. Our 8 week project will involve hacking off plaster where structural repairs are required or has become defective; provide adequate masonry repairs including brick replacements, heli-bar repairs, lintel replacements, etc. We…

100 Drayton Park

Works have commenced to this former Telephone Exchange now a residential development block in Highbury. Our works here will include: Erection of external scaffold to front elevation and temporary roof, to enable removal of existing roof level curtain walling to the top floor flats Supply & installation of new curtain walling Replacement of aluminium capping…

65 Holland Park

Scaffolding to the front elevation has now been handed over as we progress with the scaffolding to the rear. We will start scheduling the repairs this week, to identify the extent of the restoration required here and work with the Contract Administrator to deliver this project within budget and on programme. We look forward to…